Palm Beach
United States of America

Biwater AEWT has successfully completed the first phase of acceptance testing for the first five skids of ten 2.55 MGD membrane softening capacity. Biwater AEWT both designed and delivered the additional membrane capacity to Palm Beach County in Florida, USA and the plant is now continuously delivering 12.75 MGD of high quality water to the residents of Palm Beach County.

In addition to the work Biwater AEWT has carried out to install the additional capacity, we have also supplied the membrane system equipment for the system number 9.

United States of America
Biwater AEWT designed, supplied and constructed six reverse osmosis desalination skids at Collier County’s reverse osmosis water treatment plant.

United States of America
Design and construction of a 18 MGD membrane treatment plant

United States of America
This Biwater AEWT plant is very unique. It is one of the earliest designed plants to use nanofiltration membrane technology to allow the city of Boca Raton to meet the federal and state water environmental requirements.

United States of America
Turnkey construction of El Paso membrane treatment plant