Omdurman Water Treatment Plant Turnkey Construction
Sudan

Location
Omdurman, nr. Khartoum, Sudan

Completion Date
2010

Scope of Work
Build, Operation and Maintenance

Work Types
Operation and Maintanance, Water Treatment, Raw Water Pipework

This contract involves the turnkey construction of the Omdurman water treatment plant and the optimisation of the works in Khartoum, Sudan under a 10 year deferred payment capital light structure.

The project covers the turnkey design and construction of a water treatment plant and distribution systems to supply potable water to Omdurman City, part of Greater Khartoum for the Khartoum State Water Corporation (KSWC).

Biwater's scope of supply includes the construction of a 200 mega litre per day (Mld) water treatment plant, transmission mains, booster pump station, storage reservoirs and the implementation of an integrated network management system.

The aim of this project is to maximise the social and health benefits of a supply of clean, safe, reliable drinking water in a manner that is both sustainable and economically viable in the medium to long
term.

Background:

Khartoum is the most populated state in the Republic of Sudan with well in excess of six million inhabitants.

El Khartoum is the largest industrial centre in the state and is made up of three cities, Khartoum, Khartoum North and Omdurman. The latter is the largest of the three cities, lying to the west of the White
and Main Nile rivers and covers an area of 2 approximately 320 Km . In 2002 the population in Omdurman was estimated at 2,931,200 and this is expected to rise to 9,800,000 by 2040.

There is a critical shortage of potable water in Greater Khartoum city. The estimated current demand is in excess of one million cubic meters per day, with around two-thirds of the city currently not supplied with water. Omdurman is the area with the greatest unserved population.

Scope of Work

Biwater's scope of works covers the construction at the El Manara site and the distribution of potable water to Omdurman City. Biwater will design, construct and commission:-

  • A river intake, a raw water main and a 200 Mld water treatment plant located at the El Manara site on the Nile River and will include a laboratory, a workshop and an administration building.
  • One 12,000 cubic meter storage reservoir at the water treatment plant.
  • Approximately 11 Km of 1,200 mm treated water main to a new 40,000 cubic meter storage reservoir, complete with booster pump station.
  • Approximately nine Km of 700 mm treated water main to the existing 14,000 cubic meter storage reservoir, south of El Manara.
  • Approximately three Km of 400 mm treated water main from El Manara site to the main road where the pipe will run to the north. KSWC will connect to this main to distribute water to the areas north of the new treatment plant.
  • A distribution network designed to ensure the optimum distribution of water produced at the treatment plant. The size and design of the network will be developed during the project under as part of the water asset management (WAM) strategy.
  • WAM systems and equipment, as elaborated below.

Water Asset Management Strategy:

The need for additional potable water supplies is crucial to the population of Khartoum. However, in addition to the increased production of water, it is essential that KSWC maximises the revenue from water supplied to consumers through an efficient distribution system.

Biwater has therefore incorporated a WAM strategy that will be undertaken as part of the capital works programme.

This initiative will optimise the performance of the distribution network and reduce non revenue water in Omdurman via management and consultancy services. The scope of these services will be refined following final design studies, but the main features will encompass:-

  • Information gathering on the current network
  • Creation of network models and geographic information system (“GIS”)
  • Design of the control system
  • Establishment of DMAs on the existing network
  • Meter installation in DMAs
  • Construction of the water distribution sites
  • Categorising customers and per capita consumption calculations
  • Customer education
  • Design of distribution extensions
  • Leakage control
  • Pressure management (if appropriate)
  • KSWC staff training
Panama
Turnkey construction of a new water treatment plant plus rehabilitation of another water treatment plant

Nigeria
Refurbishment and modification of existing water treatment plant.

Dominican Republic
The new plant will supply drinking water to the city of Nagua and its surroundings on the north coast of the Dominican Republic.

Dominican Republic
On 4th May 2007, Biwater International signed a new contract with Instituto Nacional de Aguas Potables y Alcantarillado (INAPA) for the turnkey design and construction of the extension works to San Francisco de Macoris, with finance supported by USEXIM bank.