Cheltenham Leisure Centre Flood Inspection
England
Location
Cheltenham, England
Project Type
Inspection report
Project Duration
2 weeks
Completion Date
2007
|
|
Biwater Leisure was commissioned to inspect the swimming pool plant installation following the catastrophic flooding in 2007. The pool plant room, located in the basement of the building, was submerged under four meters of water. Following this, the client called in experts to assess the damage and provide proposals for the re-instatement of the pool and treatment systems.
Biwater mechanical and electrical engineers attended site over a number of days and provided a comprehensive document detailing the damage to all pieces of equipment, from sand filters to flowmeters, together with recommendations for actions required to re-instate the pool complex.
|
|
|
United States of America
Detailed design of waterpark water treatment and features
United Kingdom
The swimming baths at Fullwell Cross originally housed a 33 metre long, eight lane pool which was constructed in 1967. This was sub divided at a later date into a 25 metre long main pool and learner pool using a fixed boom and fixed false floor.
United Arab Emirates
Biwater Leisure undertook the project management for the design, supply and installation of the water filtration and feature systems on this prestigious project in Dubai.
England
A new, remodelled leisure centre that incorporates a refurbished 25m competition pool, a separate leisure pool with flume, a fast moving river, a wave machine and many water features.
|
|